Jump to content

USS Parche SSN-683 (Late) from Mikro-Mir


Recommended Posts

Just delivered - courtesy of Hannants and Royal Mail - Mikro-Mir's latest 1/350 scale submarine USS Parche SSN-683 - Late Version.

 

Box art - note the divers lockout chamber on the aft casing - disguised as a DSRV..........

 

spacer.png

 

The instruction sheet is a flimsy A4 page folded in half ........... the first page gives a brief potted history of the boat and a painting guide (!)...

 

spacer.png

 

The reverse is the construction diagram.......

 

spacer.png

 

The hull is split horizontally.....

 

spacer.png

 

The only other sprue provides the upper and lower decking, sail, control surfaces etc.... note that it DOES NOT include the DSRV !!!

 

spacer.png

 

The package is finished off with a small decal sheet for the depth markings and escape hatches - plus a small etched brass part for the propeller and towed-array sonar.

 

spacer.png

 

This is another nice kit from the prolific Ukrainian enterprise of Mikro-Mir - but they are being a bit naughty not including the DSRV - as it is already provided in their (Early) version kit....

 

spacer.png

 

Note the DSRV at top left.

 

As I have already scratched a model of this version :- http://www.flankers-site.co.uk/model_submarines_USA.html#USS_Parche_SSN-683_

it will be interesting to compare mine with MM's kit - they probably had more info to hand -

 

I couldn't find much about the 'Hush-Hush' undersides at the time -

but I have just found this cutaway drawing... https://i.pinimg.com/originals/fa/70/a6/fa70a6ef6d59cc1e12d33ca39229e447.jpg

 

All my 1/350 scale subs are here :- http://www.flankers-site.co.uk/model_submarines_link_page.html

 

Stay Safe...

 

Ken

 

  • Like 2
Link to comment
Share on other sites

As with most Mikro-Mir sub kits, the parts have large sprue gates and need a lot of 'fettling' (scraping and sanding) to make good mating surfaces.....

 

The ventral structure for the divers saturation chamber is made up from two sides and a floor (or 'roof' - depending on your point of view).....

 

spacer.png

 

There are no positive location pips - so I added strips of L-section plastic to form a ledge on which the 'floor' can sit.....

 

spacer.png

 

This made locating the sides much easier....

 

spacer.png

 

..... although there are still seams to fill.....

 

spacer.png

 

Similarly, the top and bottom hull halves needed a lot of work to scrape away flash from the mating surfaces -

I have added strips of thin plastic card to make a better join........

 

spacer.png

 

More later.....

 

Ken

  • Like 2
Link to comment
Share on other sites

A little progress......

 

Taping the lower pannier to the hull........

 

spacer.png

 

...reveals a large mis-fit at the front and rear......

 

spacer.png

 

I sanded the mating surfaces to a bevelled-edge - which made the fit better... and finished off with filler.

 

spacer.png

 

The Conning Tower/Bridge/Sail is made up from two sides and a top section...

 

spacer.png

 

Guess what? - the cutout in the top decking doesn't match the contours of the sail - so more fettling and filler...

 

spacer.png

 

Finally - all the major parts are fitted and she's ready for a coat of primer....

 

spacer.png

 

I'm hoping that the overall black finish will hide a lot of my botching......

 

More later...

 

Ken

  • Like 4
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...