The USAF aircraft could fly until c2050. The next item to be looked at is the engines with the JT8D-219 being the current favourite due to low acquisition costs rather than the CFM-56 as on the RAF and French aircraft.

Link to comment
Share on other sites

10 minutes ago, EwenS said:

The USAF aircraft could fly until c2050. The next item to be looked at is the engines with the JT8D-219 being the current favourite due to low acquisition costs rather than the CFM-56 as on the RAF and French aircraft.

Slightly left field but couldn’t the USAF buy second hand CFM56’s? After all the E-8’s were second hand and surely zero houred 56’s would be cheaper than JT8’s which are let’s face it are many years out of production.

 

Trevor

Link to comment
Share on other sites

34 minutes ago, Max Headroom said:

Slightly left field but couldn’t the USAF buy second hand CFM56’s? After all the E-8’s were second hand and surely zero houred 56’s would be cheaper than JT8’s which are let’s face it are many years out of production.

 

Trevor

Well the JT8s are being quoted as 50% of a CFM56 so there is quite a gap to bridge. CFMs are also a very popular engine as the power both A320s and B737s so obtaining second hand engines in the market place could be problematic in terms of the numbers being required to re-engine the whole fleet.

The JT8 200 series were the main power plant for the MD-80 series which are being retired from airline service.

  • Like 1
Link to comment
Share on other sites

On 19/10/2018 at 06:39, Slater said:

The RAF appears to be taking some heat for looking to Wedgetail as the preferred solution, and not giving consideration to the Airbus/SAAB A330 option (although this is just on paper at present).  

 

It appears that the cunning plan is to fit the Eyrie kit to our fleet of Voyagers. 

 

Yes.

 

Those Voyagers. The ones that do AAR. Which the RAF doesn't own.

 

You might just as well give Airtanker the PIN number for the government's bank account and say 'if you wouldn't mind leaving £2.50 in there so we can pay the milkman, please', cross your fingers and hope you do have enough for a pint of semi-skimmed when it's all over.

 

https://www.flightglobal.com/news/articles/saab-voices-opposition-to-uk-wedgetail-buy-452945/

 

The Defence Select Committee are lucky it was Rich Knighton answering the questions. I can just imagine if it had been Phil Osborn:

 

"So why aren't you considering the SAAB offer, Air Marshal Osborn?"

 

Swearing removed

Link to comment
Share on other sites

^^ Can’t see that happening. As a PFI project the terms and conditions would be so tightly stitched up in Air Tanker’s favour that any change would incur a whopping penalty so as to make any savings in utilising an existing airframe minimal.

 

Trevor

Link to comment
Share on other sites

You couldn't make it up.

 

Same thing with the Merlin.  There has obviously been some massive technical advance in the world of AEW that enables one aircraft to be in 2 places doing 2 different jobs at the same time.

 

what a pity for the future defence of the realm that AM Osborne was not answering questions that day. 

Edited by Seahawk
Link to comment
Share on other sites

Don’t forget that there would have to a trial installation to shake out any bugs, then the crews need training up, whereas in that same timescale you could order Wedgetail and crew it on delivery with pre trained crew.

 

I’m guessing their Airships have also taken into account how much longer the E-3’s can be kept flying, so that an A330 option ready ‘sometime’ (mid 2020’s?) is a non starter?

 

Trevor

Link to comment
Share on other sites

Although competitive selection should be the way to go, in this case it would not serve the tax payers pocket. However,  this is not a situation that has suddenly presented itself. The MOD and industry should have been talking about this for some time now. Airbus and SAAB etc should have been making advances to the MOD  some time ago. Wagtail is the way to go I think, but I don't recall a situation such as this before. No doubt someone will rattle my memory with something similar from history. 

 

Keith. 

Link to comment
Share on other sites

On 10/20/2018 at 11:19 AM, Truro Model Builder said:

I hope we stick with the Wedgetail name. Atlas is a superb name for an airlifter, but I'm not so sure about Voyager, and as for Airseeker...:sick:

If I could just divert this away from the E-7 for a moment, may I just point out that Airseeker is not the name of the aircraft. The programme to procure the RC-135W Rivet Joint for the RAF was the Air Seeker programme, one of a triumvirate of programmes along with Sea Seeker and Land Seeker.

Link to comment
Share on other sites

  • 3 years later...
  • 3 months later...
7 minutes ago, GMK said:

First multi-role electronically scanned array - or MESA - is lifted onto the RAF’s first Wedgetail. 
 

spacer.png

In 2016 I took a trip to Montana and just outside of Billings I passed a train. The coolest part of that train was it was coming from North Carolina. Of all things it was carrying 737 Fuselages. Y6IJDKR.jpg
 

6uq8AzE.jpg

 

rJPCb2v.jpg
 

@GMK seeing your photo reminded me of these photo’s because of the green protective coating. 
 

Dennis

  • Like 2
Link to comment
Share on other sites

39 minutes ago, Corsairfoxfouruncle said:

In 2016 I took a trip to Montana and just outside of Billings I passed a train. The coolest part of that train was it was coming from North Carolina. Of all things it was carrying 737 Fuselages. 
 

@GMK seeing your photo reminded me of these photo’s because of the green protective coating. 
 

Dennis

The worrying thing is that some of those airframes arrive at the factory with bullet holes in them...

  • Sad 3
Link to comment
Share on other sites

17 minutes ago, Greg B said:

The worrying thing is that some of those airframes arrive at the factory with bullet holes in them...

Yes I know and some never make it, a couple of years ago a train de-railed in Montana or Idaho. Several of them rolled down a mountain into a river and had to be destroyed fir scrap. 

Link to comment
Share on other sites

4 hours ago, Greg B said:

The worrying thing is that some of those airframes arrive at the factory with bullet holes in them...

Assuming it is not stray bullets continuously ...Seem to be a threat to some... stand your ground? 😀 

Link to comment
Share on other sites

6 hours ago, Corsairfoxfouruncle said:

Yes I know and some never make it, a couple of years ago a train de-railed in Montana or Idaho. Several of them rolled down a mountain into a river and had to be destroyed fir scrap. 

 

It was the Clark River in Montana in July 2014 although the picture does a bit like a still from a fifties' Ray Harryhausen monster movie

 

spacer.png

 

And the fuselages also seem to be a popular cargo within the model railway community

 

spacer.png

  • Like 3
Link to comment
Share on other sites

  • 4 weeks later...
5 hours ago, Max Headroom said:

Any chance of the original order number being reinstated?

Of course.... in the last year many previously thought impossible things turned into hard reality...

But generally, as specific capability  goes up, price does as well but numbers go down...

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...