Jump to content

Russian BMR-3M Armoured Mine Clearing Vehicle - 1:35 Meng


Julien

Recommended Posts

Russian BMR-3M Armoured Mine Clearing Vehicle

1:35 Meng Model via Creative Models

 

bmr01.JPG

 

 

The BMR-3M Vepr is the latest Russian mine clearing vehicle. The BMR-2 was based on thr T-54 chassis, and the BMR-3 the T-72. The New BMR-3M which is a private venture from Uralvagonzavod utilises the T-90 chassis. The turret has been replaced by a welded on deck housing which for additional protection is fitted with Explosive Reactive Armour Blocks.  The space inside allows for a crew of three and two engineers to assist with mine clearing, all having blast suppression seats. The vehicle is fully NBC protected and the crew can live inside for 2 days. For its mine clearance role a composite construction belly armour plate has been fitted. Actual mine clearance is provided by KTM-7 mine rollers. These will detonate pressure mines, and chains strung between the rollers will detonate rod type fuses. The BMR-3M is also fitted with mine ploughs to removed panted in mines. Depending on conditions a clearing speed of upto 12kmh can be achieved. In addition to the convention mine clearing attachment the vehicle is also fitted with a full electronic counter measures system.  For self protection the BMR-3M is fitted with a remotely operated turret with a 12.7mm machine gun. This can also be used to detonate surface mines. For road travel and when not mine clearing the vehicle is fitted with its own crane and racks in order that the mine rollers are lifted onto the back deck of the vehicle. 

 

 

The Kit

This is another left field release from Meng, though it is good to see these types of vehicles being kitted. The first thing that strikes you is that it is a big box, it needs to be as its stuffed with plastic. & sprues of tracks, plus 7 lots of end connectors. The there are 25 sprues of plastic, the two main hulls, a length of chain, some PE, a flexible sprues and a set of jigs for the suspension and the tracks. Construction starts with the running gear. Two idler wheels, tweo drive sprockets and 12 road wheels are built up, all have a poly cap centre.

 

bmr02.JPG

 

bmr03.JPG

 

Next up the additional belly armour is added to the lower hull.  The track return rollers are added along with mounts for the idler wheels. At the front additional armour which also mounts the mine rollers is added.

 

bmr04.JPG

 

The torsion bar suspension is added next and if glued in correctly will work like the real thing. The rod go through to the other side where only the ends (as shown on the instructions) are added.  There is a Jig supplied to ensure everything stays at the right angle while the glue sets.  The rear bulkhead is then added along with the drive sprocket fixings. All of the wheels can now be added.

 

bmr14.JPG

 

bmr06.JPG

 

The tracks are a work of art, but you have to follow instructions carefully and not be too free with the glue if you want them to remain workable after completion. The hollow guide horns are supplied as pairs, which clip onto the central area of the track pins, which are moulded into the main track parts. You must assemble short lengths before separating the two from their little sprue-runner to ease handling, then insert the runs into the two-piece jig that is supplied on its own sprue. Then you insert the flexible styrene track-ends into yet another part of the jig, cut them from their runners, and apply them to the ends of the track pins in runs of five on each side using no glue! The track pads are added once the tracks are complete if you wish, though this is not shown on the instructions. Two sets of 81 links are needed, so again, you'll be working for some time with the jig, but the results should be well worth the effort. The tracks are then wrapped around the wheels and closed with two of the flexible end parts.

 

bmr05.JPG

 

Once the tracks are on then its onto the main upper deck housing. This is built up from 4 sides and the top, it is then added to the upper main hull  along with the frontal plate to which the ERA blocks are added.  The side upper track fenders are added along with the front mud guards and exhaust covers. Some smaller attachments are added along with the rear PE grills and their covers.

 

bmr09.JPG

 

Next up is to concentrate on the rear deck. Various handles and brackets are added and then the mine roller stowage rack is added along with a beam and the auxiliary fuel tanks (drums). Flexible pipe is supplied for the tank connectors. A stowage box and an additional ammunition box are added to the rear along with an antenna base.

 

bmr10.JPG

 

Moving onto the main superstructure a whole host of smaller parts are added including antenna bases which have to be made up, the smoke grenade dischargers and additional ERA blocks. The drivers hatch and vision block is also added. The side crane for lifting the mine rollers is made up and added, with one major part stowed on each side of the vehicle. The crew hatches are made up and added. Following this the track sides skirts are then built up, and all of their ERA blocks are fitted. Once complete they are added to the hull. The remote weapons station is also built up and added at this time.

 

bmr07.JPG

 

bmr08.JPG

 

Next up is construction of the mine rollers. These are little kits in their own right.  They are handed but each builds up in the same way. 6 mine-roller wheels are added together on a main axle, the axle has different diameters for the different wheels so they should all slot easily into place. The axle then attaches to the side parts and additional bars front an rear are added. Short lengths of the chain need to be added to each mine roller. Next each side has an ECM system built up and attached. The roller arm assemblies are next to be built up and added. I would suggest using wire instead of the string supplied by Meng as it will undoubtedly look better. The KMT-8 mine plough arms are then built up added to the roller/arm assembly. Once complete these can be added to the main body of the vehicle.

 

bmr11.JPG

 

bmr12.JPG

 

bmr13.JPG

 

 

Markings

There are no markings supplied with the kit, but there are three different camouflage schemes included from the 2009, 2014 & 2015 Russian Arms Expos.

 

bmr15.JPG

 

Conclusion

Another great release from Meng of a less than traditional subject. The parts count is high but not unnessasarly given the complex nature of the Mine Clearer. Once completed it will look like an impressive model.

 

Highly recommended.

bin.jpg

 

Review sample courtesy of

logo.gif

  • Like 6
Link to comment
Share on other sites

  • 2 years later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...