Jump to content

ERK

Members
  • Posts

    750
  • Joined

  • Last visited

  • Days Won

    1

Everything posted by ERK

  1. Evening all, more work on my Little Hood - starting with the rear block on the rear boat deck, this has several items attached to it from PE railings to the signal platforms and the reat Hacs. Erk.
  2. Lots of magnification a steady hand - lots of magnification oh and good light. Erk. Thank you Jon, hope you have a great safe one also. Erk.
  3. Evening all, a wee bit of work this evening - putting some details on the bridge and a bit more PE, also I have put a Ten Pence Piece next to it for scale and my glasses. Erk.
  4. Thank you Jon, I will put a coin next to it when I am on here again later. Erk.
  5. Evening all - I called on the "Borrowers" to carry on with my tiny PE - more ladders and rails and a few binocular stands. Erk.
  6. Evening all, more work continues with the Conning tower fixtures - there are several sections of handrails to go on, but as they are 0.11mm by 1.2mm tall - handling them let alone fitting them is a trial in itself, the PE ladders are childs play by comparison. Erk.
  7. Hi All, another slight update - I have added some more levels and bits to the conning tower, and I have added one of my little 28mm figures for scale. Erk.
  8. Hi there all, not anything drastic as I am pregressing with my little hood slowly - trying not rush her, so basicaly just awee bit of detail on the conning tower and dry fitting a few of her levels. Erk.
  9. Very nice work Jon, of an unusual subject - I love your ideas for glazing in the windows - excellent idea. Erk.
  10. I was/am tempted by Flyhawks HMS Kelly - yep brought on as I have the film "In which we serve" all about her. OC.
  11. That is mutch mutch better - very clear and easy to see whats going on now on oyur Amazing build - even the deck crew have thier own differences. Well done Superb job. Erk.
  12. Hi All, more work on "Little Hood" - I have fitted the Two Hacs units and the Direction Finder has been fitted to the top of the front housing (that is just dry fitted for now as it will be painted seperatly). Erk.
  13. Hi all, so more work has been continuing - I have started work on the base of the conning tower, its a one piece section with lots of sub assemblies fitted to it starting with the PE stairs then a centre fitting, then the side davits and floats also some what I assume are wind breaks, also couple of paravanes were glued in place. Next job was to fit the flag cases, then another tiny deck building - followed by Two vent units and the Two direction finder masts, oh and a centre mast was glued in place, they still need some clean up to remove a few blemishes from where I cut them from the sprues. The main assembly is just dry fitted as It will be primed and airbrushed first before I hand paint the floor in Corticene. Erk.
  14. Thank you kindly David, she sure was a lucky ship - couldn't get over when she was bombed Three in total - one nealy took her radar out, the other missed her torpedo bulge and one went right through her next to her funnel went through one of her engine rooms and clear through her bottom hull - but she still limped into port. Amazing ship. Erk.
  15. Evening all a bit more progress - some more PE fitted a long with some tiny boats (one of the small pilot boats needed a tiny roof fitting) also a few more floats and an a small structure was added. Erk.
  16. Just answered my own question - good to see.
  17. You got the build up in MSW aswel mate? Erk.
×
×
  • Create New...