I cut the birdcage sight from the PE sprue.
On its own it looks even smaller.
Added some more parts. I found that, sanded slightly, the hull MG went in from the outside. The smoke bomb launcher tubes are three separate items that have to be individually tweezered into place.
I found the lost PE fender support stuck to the front of my fleece after a couple of days of intermittently interrogating the carpet monster so I cleaned off the fluff, straightened it out and re-fitted it.
The headlight brush-guards proved an issue. The first one pinged into oblivion as I tried to clean it up. The second snapped. The sprue attachment points are quite heavy.
Plan B. I made, not very successfully, some wire replacements. Not happy so I suspect these will need to be re-done.
Thanks for looking in, comments and advice welcome.