Jump to content

adilson

Members
  • Posts

    118
  • Joined

  • Last visited

About adilson

  • Birthday 27/02/1976

Profile Information

  • Gender
    Male
  • Location
    Curitiba - ParanĂ¡ - Brazil.

adilson's Achievements

New Member

New Member (2/9)

191

Reputation

  1. Returning to work with him soon news ....
  2. Awaiting parts for Lancaster Tamiya, mounted in recent months the Corsair from Tamiya 1/32, following photos.
  3. Lancaster in the most time-consuming part, but step by step ... soon I hope, that the flow faster. Engines support. By...
  4. Sequence of work, and a half time consuming part but it yielded better than expected, following photos ... I started to make the fire wall, made in brass ... Lack finished yet. All aligned, set up perfectly. Tail... Set the engine cooling liquid tanks. We will have three engines 100% exposed. Until the next guys ...
  5. Weekend can start the hydraulic part of the engine, which promises a lot of work. the heating system of the cabin has been done. Corrected a painting bug, the version that will represent the inside of the flap and landing gear bay are in green primer. installed fuel tanks, along with tubing and filters. By....
  6. Good day, would be to fix a pump or fuel filter, besides pipe. By...
  7. Too busy with work, but trying to keep ... Photo with modified parts running. Starting the fuel tanks. landing gear running 50% ready. By... I appreciate the visit of all ...
  8. Continuing with the work ... Correcting the radiator air outlet. Remaking the tank cover. Primer surface. Starting strengthening the landing gear. Starting the production of flaps. By...
  9. Friends, reaching the most complicated part, landing gear support, followed by the engines. Before you need the radar that does not come with the kit. Using a can of soda did the radar. Aluminum made the new landing gear holders, they also serve the fire wall mount later on. This being totally rebuilt the stringer support of landing gear and engines. See you tomorrow guys...
  10. Lancaster in progress,... that exhausting work .... reinforcement girders installed. Adjusted the upper wing. By...
  11. Sequences at work. Finishing the fuselage Cutting rudder and elevator. Ready to cut parts of the wings. Reinforcing the wings with new spars. Gear bay rebuilding Detailing inside the wings. Adjusting the wings. By....
  12. thank you, plan something that will please everyone ... in relation to the internal details.
  13. Thank you, this bomber model deserves total dedication to detail
×
×
  • Create New...