Jump to content

Search the Community

Showing results for tags 'Crane'.

  • Search By Tags

    Type tags separated by commas.
  • Search By Author

Content Type


Calendars

  • Community Calendar
  • Group Builds
  • Model Show Calendar

Forums

  • Forum Functionality & Forum Software Help and Support
    • FAQs
    • Help & Support for Forum Issues
    • New Members
  • Aircraft Modelling
    • Military Aircraft Modelling Discussion by Era
    • Civil Aircraft Modelling Discussion by Era
    • Work in Progress - Aircraft
    • Ready for Inspection - Aircraft
    • Aircraft Related Subjects
  • AFV Modelling (armour, military vehicles & artillery)
    • Armour Discussion by Era
    • Work in Progress - Armour
    • Ready for Inspection - Armour
    • Armour Related Subjects
    • large Scale AFVs (1:16 and above)
  • Maritime Modelling (Ships and subs)
    • Maritime Discussion by era
    • Work in Progress - Maritime
    • Ready for Inspection - Maritime
  • Vehicle Modelling (non-military)
    • Vehicle Discussion
    • Work In Progress - Vehicles
    • Ready For Inspection - Vehicles
  • Science Fiction & RealSpace
    • Science Fiction Discussion
    • RealSpace Discussion
    • Work In Progress - SF & RealSpace
    • Ready for Inspection - SF & RealSpace
  • Figure Modelling
    • Figure Discussion
    • Figure Work In Progress
    • Figure Ready for Inspection
  • Dioramas, Vignettes & Scenery
    • Diorama Chat
    • Work In Progress - Dioramas
    • Ready For Inspection - Dioramas
  • Reviews, News & Walkarounds
    • Reviews
    • Current News
    • Build Articles
    • Tips & Tricks
    • Walkarounds
  • Modelling using 3D Printing
    • 3D Printing Basics
    • 3D Printing Chat
    • 3D Makerspace
  • Modelling
    • Group Builds
    • The Rumourmonger
    • Manufacturer News
    • Other Modelling Genres
    • Britmodeller Yearbooks
    • Tools & Tips
  • General Discussion
    • Chat
    • Shows
    • Photography
    • Members' Wishlists
  • Shops, manufacturers & vendors
    • Aerocraft Models
    • Air-craft.net
    • Amarket Model
    • A.M.U.R. Reaver
    • Atlantic Models
    • Beacon Models
    • BlackMike Models
    • Bring-It!
    • Copper State Models
    • Freightdog Models
    • Hannants
    • fantasy Printshop
    • Fonthill Media
    • HMH Publications
    • Hobby Paint'n'Stuff
    • Hypersonic Models
    • Iliad Design
    • Hobby Colours & Accessories
    • KLP Publishing
    • L'Arsenal 2.0
    • Kingkit
    • MikroMir
    • Model Designs
    • Modellingtools.co.uk
    • Maketar Paint Masks
    • Marmaduke Press Decals
    • Parkes682Decals
    • Paulus Victor Decals
    • Red Roo Models
    • RES/KIT
    • Sovereign Hobbies
    • Special Hobby
    • Test Valley Models
    • Tiger Hobbies
    • Ultimate Modelling Products
    • Videoaviation Italy
    • Wingleader Publications
  • Archive
    • 2007 Group Builds
    • 2008 Group Builds
    • 2009 Group Builds
    • 2010 Group Builds
    • 2011 Group Builds
    • 2012 Group Builds
    • 2013 Group Builds

Find results in...

Find results that contain...


Date Created

  • Start

    End


Last Updated

  • Start

    End


Filter by number of...

Joined

  • Start

    End


Group


AIM


MSN


Website URL


ICQ


Yahoo


Jabber


Skype


Location


Interests

Found 2 results

  1. Stratenwerth 16T Strabokran & Vidalwagen with V-2 Rocket (2123) 1:35 Takom via Pocketbond The V2 rocket was way ahead of its time and was the world's first ballistic missile designed by a team led by Werner Von Braun, who was later captured by the Americans and became the driving force behind the Apollo programme. The rocket weighed in at over 12 tonnes, so handling it was a task for large equipment that was designed specifically for the task. Due to its short range it was necessary to launch them close to the Channel in order to reach London, so mobile carriers/erectors were designed by Hanomag, and Takom have already kitted this as number (kit #2030). A handling trolley was made to carry the rockets shorter distances behind a lorry (without the erection/launch capability) and was known as a Vidalwagen, with a 16 tonne gantry crane called the Strabokran that could be dismantled or erected in an hour by a team of 10 men. This combination of equipment permitted the rockets to be launched from ad hoc sites and allowed the crews to leave the area before any retribution from the Allies could be attempted. Of course the advancing Allies eventually put paid to their mobile launches as the front line went past the V-2's ultimate range, and the RAF's carpet bombing of their permanent launch facility La Coupole in France before it could be brought into service. The final V-2 was launched on 27th of March 1945, and once the factories were over-run the missiles and their equipment were hoovered up by the Allies, including the British with real examples of this kit stashed away in warehouses by the RAF Museum. The Kit This is a new offering from Takom that is a bringing together of previous releases in a new box. The V-2 was originally released some time ago and has been included in other boxing, as has the Vidalwagen. Finally the 16T Strabokran was originally released as a tank related kit (sometimes boxed with a Panther kit), because the same crane was used by the Wehrmacht as by the V-2 crews. Overall, it's an interesting combination of parts that you can now buy in one box, which suits me nicely. I like V-2s. Not what they were used to do, but the technology. The kit arrives in a standard Takom top-opener box and inside are 17 sprues in grey styrene, two bags containing 6 and 8 black rubberised tyres, a bag of copper chain, two decal sheets, two Photo-Etch (PE) sheets and two long lengths of thin and thicker braided cord. There are two main instruction booklets, plus a separate sheet to show how the V-2 is suspended from the crane, and if you have any other boxings you'll possibly be familiar with them. One booklet is entitled "Hanomag SS100/V-2/Vidalwagen", but the SS100 related pages have been removed. The Strabokran instruction booklet is separate and was available separately initially, so no changes there. Even though I have stood beside a full-size V-2 at Cosford, the size of it in the box is impressive at around 38cm (15") even without the very tip of the nose cone and the fins. Detail is what we've come to expect from Takom with many rivets and panel lines on the rocket, and well moulded framework for the trailer and crane plus all the extras that are sometimes left out of other models, such as the cord, PE and chain. Construction begins with whatever you fancy really, as there are three main elements to this kit, and you can arrange them however you like. Make your choice and build them up in the order you see fit, and try to resist the urge to put a huge diorama together than includes a Hanomag SS100 and another V-2. We'll start with the rocket and its trailer, as that's the fun part and there's no messing about with cockpits and gear bays so it should go together pretty quickly. The trailer is first for consideration, and is a simple tubular framed chassis with a fixed rear axle and a pivoting front axle with towing hitch leading the front wheels. It begins with a triple towing tube that has a central shock-absorber between it and the towing vehicle, with the twin leaf-springs either side of the front axle and one wheel per side, which are made up from a two-part hub slipped from either side into a flexible plastic tyre. There is also a collar inside the central cap that allows the wheel to rotate on the axle, so take care with the glue at this point. The rear is made up from a shallow A-frame that has a tubular "bumper" around it to protect the rocket's fins from damage, and this has the two cradles fitted to its topside, and more bracing tubes added all around before adding the rear axle and damper onto two more leaf-springs with dual wheels on each side. This is attached to the bottom of the rear frame along with the towing arm and front axle to finish it off. The rocket is made up from two parts that make up the pointy end and the majority of the body, with a one piece ring between it and the lower portion where the fairings for the fins are found, which are again made up from two halves. The exhaust chamber is fitted into the lower end of the rear with some small vents on the exterior, with the graphite steering vanes added in the path of the exhaust. The fins are joined to the fairings via a pair of tabs and slots and the three sections are brought together, plus some tiny little fasteners are added to the nose section equipment bay then tipped with a separate part to get the desired point. To join the rocket to the trailer, a few small parts are added to the sides of the rocket and a pair of PE straps are used to tie it down, with plastic parts representing the ratchet mechanisms used to tighten the bands. The last diagram isn't necessary but shows the trailer being hitched to an SS100 as per the original kit these instructions came from. The Strabokran has its own instructions, and construction of this element begins with the horizontal box-section that contains the shuttle from which the jib hangs. This is moved from side-to-side by pulling on the chain loops at the end, and another hanging chain allows the hook to be raised and lowered. This is built up in much the same manner as the real thing, with the sides fitted with end-plates, bobbins and pulleys, and an electric motor at one end. The shuttle runs along rails and is moved by being incorporated into two loops of chain that wrap around pulleys at each end, and after insertion the top section of the gantry is fitted in place with a plate over the pulleys and motor to protect them from the weather and falling debris. The legs to the crane are based upon large bogies that have twin wheels at each end and when in position they are jacked up on legs to prevent slippage. The bogies and upstands are made up and joined together to make an inverted T-shape, the height of which can be adjusted on the real thing using the gears, pulleys and cables within the structure. They can also be flat-packed for towing, so make your selection early in the build, and cross out the steps you won't need to follow to avoid mistakes. The structure is built up much like the real thing with the cable substituted with cord and scrap diagrams showing the layout. You will have to take your time over this process to ensure you make no mistakes, but the result should be well worth the effort. An axle is attached under the bogie and the twin wheels are fitted to each end, then the jacks are added to the holes in the ends of the bogie. You'll need one for each side, so repeat until you have two of whichever flavour (up or down) you have chosen. The erected legs have some small parts added before completion, while the two packed legs have the towing arm added to one, and a couple of braces fitted under the rearmost section, then glued to the circular attachment points under the gantry. The process for the erected crane is similar but for the height off the ground when finished! Because the Strabokran wasn't originally released with V-2s in mind, there is a separate sheet of instructions that show how the cradle is built and attached to the lashing points on the missile, with cord, lifting eyes and PE straps included, and a final drawing showing the cradle fitted to the rocket and how this attaches to the crane. Markings The painting and decaling instructions are found at the back of each booklet of this kit, and you can bet your boots that the rockets are all painted the prototypical black and white chequered pattern, while the Strabokran can be painted dark yellow, green or camouflaged in both colours, and the Vidalwagen is either panzer grey or dark yellow. The decal sheets are miniscule and are printed mostly in black and white with a couple of red stencils for the rocket, and as such registration, clarity and sharpness are more than adequate for the task. Be warned – decaling won't take long! Conclusion Sure it's not new plastic, but if you're interested in the V-2 then it's a nice way of displaying one in a slightly different manner than usual, either leaving the factory or being transferred from one carrier to another for launch or transport. Detail is good, and as long as you take care with cabling and chaining up the Strabokran, you'll end up with an excellent replica. Very highly recommended. Review sample courtesy of UK Distributors for
  2. Bussing NAG 4500A w/ Bilstein 3T crane AFV Club 1:35 The foundation of the company Bussing goes back to the year 1903. Bussing is considered the oldest German lorry manufacturer. In 1931 Bussing took over AEG daughter company NAG and became Bussing-NAG. This company manufactured many lorry types from 1.5 ton to 11.5 tons payload. The Bussing-NAG type 500 was manufactured from 1939 to 1941. Beginning in 1940, it was designated Bussing-NAG type 500 S. It was propelled by a 6 cylinder, 105 HP diesel engine and had a payload of 4.75 tons. The Bussing-NAG type 500A was developed in the beginning of 1939. It was made in small numbers from late 1940 to 1942. Unlike to the Bussing-NAG type 500S it had all wheel drive. The Bussing-NAG type 4500 S was the successor model of the Bussing-NAG type 500S. Outwardly, it looked different, but it was based on the same technology. It was manufactured from 1942 to 1945. A whole range of alterations were introduced into the series production units of the Bussing-NAG 4500, especially to type 4500A. Nearly 15,000 units of the type 4500 A/S were manufactured until the end of Second World War. The Model The kit is a variant of the previously released NAG 4500S and instead of the flat bed, it is fitted with a Bilstein 3T crane. The box style is typical AFV Club with a photo style picture of the built up kit with a black and white background. Inside the top opening box it is literally stuffed full of sprues. There are fifteen sprues of yellow styrene, one of clear styrene, a small etched sheet, a small decal sheet, seven vinyl tyres, a length of string and four ultra small metal parts, (so small in fact that I couldn’t get a photo of them). Naturally, being from AFV Club, this is highly detailed kit, with lots of parts, so not suitable for novice modellers, in fact it may be a challenge for even an intermediate modeller. Whilst all the parts are cleanly moulded, with some finely rendered details there is a small amount of flash,, but only on a couple of parts. There doesn’t appear to be any signs of other imperfections, but there are a lot of moulding pips. The tyres, although not to everyones taste are very well moulded with very fine tread detail, (certainly for road use, not cross country), and sidewall details, including the manufacturers name. As with most truck kits, most of the detail is on the chassis and suspension parts, and this is no different, so care and attention to the instructions and parts placement will be needed to get all the wheels to sit on the ground correctly as it looks like it will be relatively easy to get the chassis slightly skewed. As with most truck kits the chassis is the first section to be assembled. Consisting of two longitudinal rails which are joined together via six cross members, the rear most one being fitted with a four piece towing hitch with its associated spring mounted behind the cross member. Two five piece accumulator tanks are then fitted, one on each chassis rail whilst the four part exhaust/silencer is threaded through the mid section cross members and out to the left hand side. The front bumper is then fitted with two reflectors and number plate before being attached to the front of the chassis rails. On each rail, two footstep support brackets are attached, followed by the front mudguards, which have the footsteps moulded integrally. The two piece fuel tank is then fitted to the right hand rail via two triangular brackets. To the rear of the chassis, the two reflector arms are attached, and then fitted with the reflectors and the rear number plate to the left hand arm. Up forward the radiator is fitted along with the single hooded headlight and two open headlights, which come with clear lens parts. The two differentials are then assembled, the rear from five parts and the front from no less than twenty six parts, which include the very detailed, and thusly, complex, steering mechanism. The differentials are fitted to the leave spring assemblies, which, in turn are attached to the chassis. Each of the four wheels are built up with an inner hub which has a poly cap fitted into it, followed by the outer hub, then the vinyl tyres are slipped over the rims, and the centre hub glued into place. The wheels are then attached to the axles. Assembly moves onto the engine, which is made up from two halves of the block, to which the cylinder heads are attached, followed by the alternator, auxiliary drive cover and exhaust manifold. The gearbox is then assembled from eight parts, and then fitted with the two piece bell housing before being glued to the engine assembly, which is then fitted with the sump block. The engine is further detailed with the fitting of the intake manifold, three piece air filter unit, coolant pipes, fan belt and fan. The engine/gearbox assembly is then fitted to the chassis, along with the transfer box and the three driveshafts, each having separate universal joints. The gear leaver is then attached to the top of the gearbox. The assembly of the cab begins with the fitting of the foot pedals and hand brake lever, as well as a couple of fixing brackets to the floor. The bench seat base is then fitted, being topped off with a single piece seat cushion. The rear bulkhead is fitted with the single piece seat back, rear window and two hand holds. The interior of the front cab section is detailed with the fitting of the instrument binnacle, switchbox, two windscreens and a couple of fuse boxes. The three cab assemblies are then joined together and the roof fitted. On top of the roof there is a small light fitting complete with clear lens, along with two grab handles, two more of which are fitted to the sides of the rear bulkhead. The cab assembly is attached to the chassis, with the previously fitted gear stick, threaded through the hole in the cab floor. The steering column is, likewise slid into a hole in the floor and attached to the steering rack, before being fitted with the steering wheel. The bonnet centre bar is then fixed between the cab and the radiator. Each door consists of a single piece door, clear window part plus internal and external door handles. These can be fitted to the cab either open or closed positions. The four piece bonnet, with additional PE mesh fitted to the inside of the grille, and pioneer tools to each side panel, is then fitted over the engine. Unfortunately the bonnet sections cannot be posed open without resorting to some surgery. Just aft of the cab there is a large tool box, which is made up from eleven parts, inside there is a space for the spare wheel to be fitted, an eight piece manual winch, and a large catch that holds the spare wheel panel in place. On the rear panel two tool holders are fitted to opposing sides, whilst under the outer edges of the tool box the four piece Jerry can holder and six piece stowage bin are attached, before the whole assembly is fitted to the chassis. Behind the tool box the truck bed, assembled from two longitudinal rails and four cross members, is fitted to the chassis rails via eight U clamps. The actual bed itself is fitted with the six part crane turntable, two storage boxes, two rear light clusters, the two rear wheel arches, each fitted to the bed with two supports, and three cross beams. The bed is then glued into position, followed by the tool box lid and more pioneer tools, with their associated brackets. Two axle stand assemblies are then fitted to the rear of the tool box, whilst the paraphernalia required for the crane is fitted to eh bed, these include various lengths of pole, eyes, hooks and lifting beams. Five Jerry cans are then assembled and slid into their respective slot in the rack, and “locked” off with a large strap. We finally come to the crane itself. The jib is made up form five parts, with seven piece jib extender being fitted to the lifting end. The left hand side of the crane housing is made from three parts, into which the cable drums, with the string provided, wrapped around them, and ends left free, spacers and guides are fitted. The single piece right hand panel is then glued into place with the ends of the various shafts and axles slotted through the panel. The housing is partially closed off with three panels at the front and the upper guide wheel frame fitted to the rear of the roof and a long handle to the left hand side panel. The jib assembly is the attached to the cable housing, followed by the string being passed through the various guide wheels and onto the three piece hook assembly. The completed crane is then mounted onto the turntable fitted to the truck bed. The kit comes with the option of having the four stabilising legs deployed or folded, depending on how the modeller wishes to depict their model. Each rear leg consists of eight parts, whilst the front legs consist of seven. The last part to be fitted is the tool box side panel, covering the spare wheel. On the outside of this panel, two folding legs are attached, allowing the panel to be posed either open or closed. This then completes the build. Decals The small decal sheet actually has quite a few decals on it. There are mostly stencils for the crane, which seems to be covered in them. The rest are the individual truck markings for the three schemes included on the colour charts. NAG 4500A from StuG Abt.209 on the Eastern Front 1942/43 in Panzer Grey overall NAG 4500A from Panzergrenadier Division “Grobdeutschland” on the Eastern Front in Autumn 1943 in a rather purple looking German Grey. NAG 4500A of the 1st Company SPzAbt. 501, based in Tunisia in the Winter of 1942/43 in overall green brown with olive green splotches on the front half of the vehicle. Conclusion There’s not a lot more I can say, other than being an AFV Club kit it is quite complex and detail wise, complete. There is so much you can do with this truck though, with endless possibilities for diorama settings or vignettes. Modify some troops from the spares box for the crew and away you go. It is a very nice kit, but as I said at the top of this review, not one for the beginner. It’s definitely one to test your patience and dexterity, especially as there are some really, really small parts. Highly recommended. Review sample courtesy of UK Distributors for
×
×
  • Create New...